|
|
|
The TCII Batch System controls and monitors several essential facility functions including proportional control of aggregate feeders and the blending of asphalt and additives. |
|
|
|
| TCII BATCH CONTROL SYSTEM |
| • |
Standard system supports up to 5 batch scales |
|
| |
6 hot bins over 1 aggregate scale |
| |
1 asphalt over 1 scale |
|
| • |
Store up to 80 of mix designs on the hard disk drive |
| • |
Built-in diagnostics pinpoint the source of problems |
| • |
Supports six cold feed bins |
| • |
Software |
| • |
Floor mount console |
|
|
| |
| • |
Junction box |
| • |
Personal computer |
| • |
Removable hard drive |
| • |
Windows® operating system |
| • |
Backup hard drive |
| • |
Ethernet data port |
| • |
Uninterruptible Power Supply (UPS) maintains power on computer after loss of electrical power to enable orderly shutdown of the system |
|
Optional manual control panel for TCII batching.
|
|
| Optional |
| • |
Aggregate feeder control for up to 16 cold feed bins |
| • |
Communication to remote devices via Profibus to intelligent motor control devices |
| • |
Monitors drive status |
| • |
2 mineral fillers over 1 scale |
| • |
Monitors aggregate weigh belt for total aggregate rate per hour |
| • |
Control of 1 anti-stripping agent, metered |
| • |
Silo loadout |
| • |
Speed control of each feeder with actual volume calibration in rate per hour, determined by a given gate setting |
| • |
Control of 4 volumetric aggregate cold feeds |
|
|
| |
| • |
Control of 1 temperature compensated asphalt |
| • |
A split-screen feature allows editing formulas and operating the plant at the same time |
| • |
Control of 1 mineral filler or lime, volumetric measurement |
| • |
Control of 1 recycle, volumetric feeder control with total recycle being weighed on inclined recycle conveyor |
| • |
Belt weigh bridges for individual feeders |
| • |
Targets and actual rates displayed in US or Metric units |
|
For your peace-of-mind, Astec stands by the PMII by providing emergency support that’s just a phone call away, 24 hours a day, 7 days a week.
Specifications subject to change with or without notice.